  • Internship at EMTUNGA

    Meet Nadia, a building engineering student from Hermods Yrkeshögskola Higher Vocational Education in Gothenburg, currently on her internship at EMTUNGA 📘 With a passion for engineering software and a keen interest in EMTUNGA's closeness to production, Nadia is already making significant contributions through her project participation and 3D modelling projects in Revit. She is impressed by the inviting spirit of the company and the high degree of safety and thoroughness in the projects, and we're so glad you feel that way! 😊 We're excited to see her present her internship experience to her peers at Hermods and hope to welcome her back to us post-studies! Are you interested in having your academic internship with us at EMTUNGA? Click here for contact information.

  • Offshore living quarters by EMTUNGA

    Embracing Swedish innovation in quality, efficiency and predictable deliveries worldwide 🌍 Our VP Project Management, Carl-Henrik Gustafsson, was asked to summarize the main advantages of using modular solutions by EMTUNGA to reach the goals of projects or plans. "By modularizing solutions, design and fabrication can run in parallel with flexibility through complex scheduling production batches. Module sections are manufactured separately in the workshop floor off-site in a highly repetitive and controlled construction process resulting in: 🔷 Safe working environment and avoiding working at heights 🔷 Industry-leading quality, flexibility and predictability 🔷 Shorter lead time than conventional construction We fabricate and design back-to-back. Our execution model is fast, right-on-time and robust, we call it the EMTUNGA Modular Way!" 𝗚𝗹𝗼𝗯𝗮𝗹𝗹𝘆 𝗮𝗽𝗽𝗿𝗼𝘃𝗲𝗱 𝗺𝗼𝗱𝘂𝗹𝗮𝗿 𝘀𝗼𝗹𝘂𝘁𝗶𝗼𝗻𝘀 Our modules meet the toughest standards in all industries (including NORSOK A-001:2021). That is a bold claim, but we have fifty years of experience and deliveries to all continents and seas to back that claim. We can also scale requirements to fit the unique needs of each project. 𝗔𝗱𝗮𝗽𝘁𝗶𝘃𝗲 𝗼𝗻-𝘀𝗶𝘁𝗲 𝗶𝗻𝘀𝘁𝗮𝗹𝗹𝗮𝘁𝗶𝗼𝗻 Our solutions can be delivered as 100% turnkey, as a single unit, in module sections or as a complete local construction. The workforce strategy for executing the on-site installation is fully customizable. We adapt the installation based on needs, laws and regulations. EMTUNGA can take the lead, manage the whole on-site installation or collaborate seamlessly with local contractors or workforce. 𝗖𝗼𝗺𝗺𝗶𝘁𝗺𝗲𝗻𝘁 Our modules are built to last with a focus on sustainable work ethics and deliveries, and with building materials sourced as close as possible to the fabrication site to reduce transportation and promote local production. We are also committed to making living quarters where you can work, live and thrive - they should be your home away from home. Don't hesitate to contact us about living quarters, offshore solutions or solutions on land.

  • One year from contract to handover

    Is it possible to build a 1 600 m2 customized, fully functional border control centre in just 𝘰𝘯𝘦 𝘺𝘦𝘢𝘳 from contract to handover? Yes, with Turn-key by EMTUNGA! We are proud to have completed our most considerable undertaking for 2022, the new Border Control Centre for Göteborgs Hamn and Livsmedelsverket. The final inspection was just a few weeks ago, and the owner and operator are now busy moving in and starting their operation. This project will always have a special place in our hearts and minds as it was the first project amidst the pandemic. We pulled through and are grateful for the opportunity and trust of Göteborgs Hamn and Livsmedelsverket. We hope you'll enjoy it!

  • Emtunga Solutions continues its endeavour within Life Science!

    We are happy to announce that Göteborgs Hamn AB (Port of Gothenburg) has chosen Emtunga Solutions AB to deliver a turn-key building for border control for the import of food, animals and vegetation through the outer border of the European Union. To enable flexibility the building will be built as modules that can be moved within the port area if necessary. The building includes testing halls with associated sampling labs, storage rooms and storage rooms, also for refrigerated and frozen sampling objects. Administrative areas are also included such as entrance, offices, meeting rooms, archives, lockers and other personnel areas. We thank Port of Gothenburg and are looking forward to an exciting project together!

  • ACE Living Quarters on site in Baku

    The ACE Living Quarters was in April 2021 delivered by Emtunga Solution AB to our End Client BP in Baku, Azerbaijan. The LQ was successfully delivered in 23 off units, pre-assembled from 50 module sections in our yard Arendal, Sweden. Emtunga is currently involved in the LQ Hook Up work onto ACE Topside and do have presence as advisors in Baku. Thanks to BP and Topside Construction Fabricator Azfen for great and safe teamwork in Baku and throughout the project. If You are in a managing position, planning for an upgrade or a new built LQ on existing or new build platforms, just let us know and we´ll help out.

  • AFRY/Emtunga on antibiotic production assignment for the Norwegian Helsedirektoratet

    Norwegian Directorate of Health, Helsedirektoratet, is an authority working with advisory and implementation of regulations in the health sector. Now, a cross functional team from Menon Economics, AFRY and Emtunga Solutions works on an assignment for the Norwegian Directorate of Health, with the purpose of analyzing technical and economic conditions for building an antibiotic production facility in Norway. Production of pharmaceuticals and medicine can help improve countries' preparedness. The production of antibiotics is advanced and requires both facilities and expertise. To date there are no facilities that produce antibiotics in Norway. The analysis will have focus on both the economical prerequisites of, and technical aspects for establishing an antibiotic production in Norway. The study will consider, analyses of the market and sales, as well as operation- and construction costs for the antibiotics to be produced. The study will look at several alternatives and conduct a sustainability analysis for each case with an initial calculation of the climate footprint and emissions from the proposed facility. “The perfect match between AFRY and Emtunga competencies have thrown open a large window of opportunity to re-enter the Life Science market for EPC modular facilities. We are excited about the early successes in our cooperation, together we can compete as a world class supplier of EPC projects.” (Christofer Edström, Managing Director of Emtunga) The feasibility study will be a basis for decisions in the Norwegian Government Stortinget at the turn of the year 2021-2022. For more information of the Emtunga Life Science offer, please contact Lars-Gunnar Wallenius (Marketing & Sales, Life Science Manager)

  • Martin Linge platform ready for operation

    Operator Equinor has got permission from Norwegian Petroleum Safety Authority (PSA) to start using the Martin Linge platform and associated offshore pipelines in the North Sea and onshore control room. The North Sea Martin Linge field is an oil and gas discovery made in 1978, and was previously called Hild. The field is located 42 kilometres west of Oseberg, in 115 metres of water. Equinor became the operator of the Martin Linge field in March, 2018. Emtunga Solutions AB delivered the Martin Linge LQ and Helideck in May 2018 to the operator Equinor. The project was original managed by Total as operator and was ordered as an EPCC contract in April 2013. Engineering/Design, Procurement, Construction and Commissioning was performed in Emtunga’s facilities in Gothenburg/Vara. The LQ was delivered as a single unit delivery from Emtunga’s workshop in Gothenburg, Sweden. Size: 3640 m², 95 POB, 66 module sections plus helideck https://www.offshore-mag.com/production/article/14203298/north-sea-martin-linge-platform-cleared-for-startup

  • Successful load out of ACE Living Quarters

    In end of March -21, Emtunga completed a load out and loading onto two vessels of the manufactured ACE Living Quarters. ACE LQ is designed, fabricated and outfitted in single Modular Units at Emtunga yard in Gothenburg, Sweden. In order to speed up the assembly phase at client site in Baku Azerbaijan, Emtunga has assembled the single units into two or three Modular Units. The LQ is built up of 50 single units plus a helideck. LQ is designed and fabricated to facilitate POB 260. Five storages with Helideck to be placed on ACE topside in Baku. End client BP Exploration (Caspian Sea) Ltd will complete the assembly in Baku with help of Azfen at ATA Yard. Emtunga will participate as advisors in Baku for the whole hook up work. First lift onto ACE top side is planned to be 11th of June -21. Final commissioning is planned to be finished 28th of June -22.

  • TLSC webinar - Shorter time to market – better cost and time predictability

    Are you planning new laboratories, factories or facility expansion? Modular solutions increases control over cost and timelines. Emtunga Solutions AB is providing modular solutions and utilities to accommodate for the client process' content for Life Science, Food & Process and Oil&Gas industry. In this event Emtunga will talk about their versatile modular solutions and demonstrate how this save time and money in the project execution. • Fit for purpose • Versatility • Modularization of the layout • Interconnections of the installations • Flexible construction • Standardized solutions – well defined processes and technical solutions • Shorter time to market • Cost & Time predictability • Offsite construction – construction with well proven design in a controlled environment with skilled labors generating higher quality Speakers (Emtunga Solutions): Ann-Britt Trogen, Peter Ivarsson & Lars-Gunnar Wallenius When: February 4th 2021 https://www.eventbrite.com/e/emtunga-higher-cost-and-time-predictability-with-the-new-modular-trend-tickets-137931146773# Link to the presentation: https://youtu.be/m9R7sLk43c4

  • TLSC webinar - Preparation for an Antibiotic Manufacturing Facility

    Emtunga Solutions AB and AFRY were yesterday November 30th invited to the The Life Science Cluster webinar "Antibiotikaproduksjon og modulære fabrikker" to present “Preparation for an Antibiotic Manufacturing Facility”. We are really grateful for this opportunity to share our experience and knowledge to the audience. https://www.eventbrite.com/e/produksjon-i-norge-antibiotikaproduksjon-og-modulre-fabrikker-tickets-129888819957# Link to the webinar: https://www.youtube.com/watch?v=7IS3ycIIzX8&feature=youtu.be (starting 16:50) If you are interested in the presentation, please send us message and we can arrange for a copy. AFRY and Emtunga have a long history of working together and have delivered several cGMP compliant EPC project to the Pharmaceutical industry. We have recently decided to once again cooperate more permanent and offer a solid solution to the market and coming clients. With the skills that both companies possess, we will complement each other and offer strong solution for both E, EP and EPC projects to the Life Science market.

  • AFRY and Emtunga will help Cytiva expand their solvent recovery process

    Cytiva is a global provider of technologies and services that advance and accelerate the development and manufacture of therapeutics. To match the market demand, the production capacity at Cytiva’s Uppsala site is being increased and optimized to improve energy efficiency. This project will be led by a dedicated cross functional team, with team members from Emtunga and different sections of AFRY. Emtunga and AFRY have a long history of working together and have delivered several cGMP compliant EPC project to the Pharmaceutical industry. We are now happy to announce that we have decided to once again cooperate and offer a solid solution to the market and coming clients. With the skills that both companies possess, we will complement each other and offer strong solution for both E, EP and EPC projects to the Life Science market. “I am excited. I strongly believe that with strong partners such as AFRY, where we combine our excellent engineers, project managers and construction managers that Emtunga and it partners can form a solid offer that will meet or exceed any clients expectation. Together we are stronger!“, says Anneli Silfverberg, VP Engineering, Emtunga Solutions. “This is a great example of how we together with strong partners as Emtunga and the experience for different parts of AFRY can offer our clients turn-key projects. I am thrilled that we can assign this cross functional team, with great combined strength”, says Katrin Hedvall, Business Unit Manager Food & Pharma West, AFRY.

  • Fabrication milestone reached on ACE living quarters project

    Emtunga Solutions reaches fabrication milestone on ACE living quarters for BP Caspian: First sub-assembly ready and put in storage. Using our flexible modular fabrication model, the Emtunga Modular Way, we have optimized the delivery of module sections to Baku in Azerbaijan by pre-assembling the sections 3 and 3. The units are still small enough to ship on an ordinary Volga-canal ship whilst reducing the space occupied at the assembly yard and the number of crane lifts involved during final assembly. The living quarters are scheduled to be installed on the topsides in 2021.