Girassol - FPSO Project

302001122019PMgirassol_bildCLIENT: Mar Profundo Girassol (Bouygues Offshore & ETPM SA)

OPERATOR: Elf Exploration Angola (Main Operator)

YEAR OF COMPLETION AND DURATION:
Contract award December 1998. Delivered in three blocks from September to December 1999. To be erected at HHI, Ulsan, Korea on the Girassol FPSO.

SIZE AND WEIGHT: The overall module dimensions 27.0 x 24.0 x 21.0 m, five levels. Total internal area 2240 m2. Total weight 970 tonnes (shipped in blocks of 400 + 400 + 170 tonnes).

SCOPE OF WORK: Design, procurement, fabrication and mechanical completion of the E&I building for the Girassol FPSO. Supervision during hook-up and commissioning at assembly site HHI.

MODULE DATA: The E&I building will host HPU-units, high- and low-voltage control cabinets areas, instrumentation control cabinets area, telecom facilities and on top the HVAC-units for airconditioning of the building. On the roof three off air cooler units, each 36 tonnes, will be installed.

FIRE RATING: All external surfaces are H-60-rated.

REGULATIONS: API, AWS, EN, NFPA, IEC, SOLAS

302001122019PMnamnlist-1_kopia

documents
pdf Girassol turn-key Switchgear Building