B-11 Redevelopment Project

Sarawak,Lifting The modular sections were ready for sea transport June 2008 followed by modular delivery in Kuching, Malaysia July 2008. Weight 688 tonnes, split in 33 modular sections and a helideck.

CLIENT
Brooke Dockyard and Engineering Works Corporation.

LOCATION
Offshore location east of Borneo in the South Chinese Sea.

SCOPE OF WORK
EPC of 33 modular sections for local assembly into a Living Quarters. EP of external air handling units and condensing units for local installation. RFQ package for helideck. Structural design of baseframe and external stair towers and laydown area.

SIZE AND WEIGHT
32.24 x 10.35 x 14.8m in four levels including HVAC room at roof level. Total area 1,099m2 with a weight of 688 metric tonnes.

For further information see the pdf-file to the right under Documents.

 

Sarawak,Module

documents
 pdf B-11 (Sarawak)